Incoming inspection, in-process checks and outgoing sampling are three different controls. ISO 2859-1 sampling plans define how many units are checked and what acceptance number applies. A page that says quality is controlled without naming the stage tells a buyer nothing.
Manufacturing
See the public manufacturing path without turning an overview into an unverified factory promise.

Public information, clearly separated from private commercial data.
Only verified, public-safe information belongs on this corporate page. Pricing, commissions, territories, internal instructions, and unverified claims remain outside the public website.
A new mould moves through trial shots before it can run production: T1 checks geometry, T2 checks fit and finish, and a pilot run confirms yield. A lead time quoted before the tool is proven is an estimate, and it should be labelled as one.
Material substitution, a second cavity or a new subcontractor changes the product even when the drawing does not. Buyers should ask who approves a change, how a revised sample is submitted, and which batch the approval applies to.
Public boundary This page does not expose unapproved pricing, commissions, customer details, account details, or product claims.
Understand the context before choosing a route.
See the public manufacturing path without turning an overview into an unverified factory promise.